1) Regeneration gas: a combination of hydrogen and inert gasoline (hydrogen accounts for 5% -ten%)

2) Quantity: 40L fuel cylinder 10Mpa

three) Regenerative fuel tension: .05Mpa (the gasoline intake for every 50 percent hour in the state of .05Mpa is that the cylinder tension drops by one.5Mpa. If it exceeds one.5Mpa, the pressure of the strain regulator’s agenda will be lessened, if it is a lot less than 1.5Mpa Raise the stress of the pressure regulator plan)

four) Procedure: three hrs heating-three hours heating and ventilation-3 hrs vacuuming-1 hour pumping-10 hours cooling

five) Steps:

① Hook up the regeneration gas (verify the pipeline for leaks immediately after relationship: immediately after connecting, open the main valve of the strain lowering valve to the optimum, open the auxiliary meter to .1Mpa, transform off the most important valve, wait fifteen minutes, if the pressure of the auxiliary meter continues to be at .1 Mpa stays unchanged, indicating no air leakage

>②Set the strain of the auxiliary gauge of the strain reducing valve to .1Mpa (the tension in the course of ventilation is about .06-.08MPa

>③ Near the cycle and analyz

r>④Turn on the vacuum pu

r>⑤ Start regenerat

br>⑥ The new program ends at 20h (clear just before cleansing, Glove Box Application h2o and oxygen index <200p<br>

6) Note: Do not cut off the power and gas during the regeneration process (especially the first 6 hours)! Some pressure reducing valves are not allowed, and the pressure needs to be adjusted appropriately to ensure continuous ventilation for 3 ho


7) Observation: whether the regeneration gas flowmeter shows about 20L / min, otherwise adjust the pressure of the pressure reducing valve.

Your answer

Your name to display (optional):
Privacy: Your email address will only be used for sending these notifications.
Welcome to Herşeye bir cevap, where you can ask questions and receive answers from other members of the community.
...